top of page

Disaster Recovery Print Room

RAN Fire Protection Engineering was retained to provide fire protection engineering services for the renovation of the District Offices of the New York State Insurance Fund.

The scope of the project was to provide a new Alternate Disaster Recovery Print Room. RAN provided the design for the conversion from a wet-sprinkler system to a double-interlock pre-action sprinkler system for the new print room, the design included the layout of a new clean agent system, and an upgrade of the existing fire alarm system. The clean agent system provided fire protection without the risk of water-based damage to sensitive equipment within the print room.


Project Information

8,400 sqft

Project Size

$42,000

Construction Cost

Liverpool, NY

Project Location

Project Gallery

bottom of page