Residential

 

Canyon Ranch Condominiums

Lenox, MA 

Client: Harrison Design Associates, Inc

RAN Fire Protection Engineering, was retained to provide a fire protection design that includes a sprinkler system layout, a layout for the manual wet standpipe system, and a fire alarm system design. This was a complicated and detailed design process that needed the systems to blend into the building’s characteristics. The fire protection and fire alarm designs complied with NFPA regulations and Massachusetts State Building Code 780 CMR.

Construction Cost: $15.5 million Size: 108,000 sq-ft

Canyon Ranch Condominiums
Steuben Place Apartments

Steuben Place Apartments

Albany, NY 

Client: Omni Development Company, Inc

RAN Fire Protection Engineering provided consulting engineering services for the renovations to the apartments at 40 Steuben Street. RAN performed a code analysis for the installation requirements of an automatic sprinkler system and standpipe system. RAN provided construction administration support and processed automatic sprinkler system and standpipe system shop drawings and submittals.

Construction Cost: $135,000 Size: 56,000 sq-ft

Arsenal Street Apartments

Watertown, NY 

Client: Aubertine & Currier Architects

The Arsenal Street Apartments wanted to perform renovations on their building. RAN Fire Protection Engineering provided consulting services and developed construction documents. The scope of design services included the design of a NFPA-13R compliant sprinkler system.

Construction Cost: $65,000 Size: 22,000 sq-ft

Arsenal Street Apartments

Additional Projects

Sheraton Burlington Hotel

Holiday Inn Express

Flanagan Hotel

K-12

 
 
 

1062 Central Ave

Albany, NY 12205

Fax:

518-275-0792

  • RAN FPE LinkedIn
  • RAN FPE Twitter

© 2020 by RAN Fire Protection Engineering P.C.