top of page

Project Highlight

Kingston High School

Kingston, NY
 

RAN Fire Protection Engineering was retained to update the Kingston High School Field House sprinkler system. RAN performed a code analysis on the existing fire protection system to make sure that everything was compliant with NFPA standards. It was discovered that a fire pump was needed based on hydraulic calculations of the existing system. A new fire pump and existing system modifications were designed.

​

Size: 94,000 sqft; Construction Cost: $285,000

Kingston High School.jpg

More K-12 Projects

bottom of page