RAN Fire Protection Engineering was tasked with providing new fire detection design and alarm notification system, along with hydraulic calculations and sprinkler and piping location plan in compliance with NFPA 13.

RAN also assisted in developing the required design criteria for the water storage tank per NFPA 22 requirements, as well as the design of carbon monoxide detection systems per New York Building Code. RAN also assisted in the Bid Phase portion of this project, by responding to bidders, issuance of addenda, and assisting in the review of contactor bid packages.