Fire Protection Engineering Experts

We are your trusted partners in all things fire and life safety. Our experienced team are committed to delivering solutions that keep your building safe and compliant, ensuring your peace of mind.

2010

Year Established

1500+

Projects

49

States

15

Countries

Markets We Serve

RAN delivers expert fire protection services across all major markets, ensuring safety and compliance for private, federal, and state sectors. Having successfully addressed the unique challenges of maximum security correctional facilities, high-rise office buildings, data centers, and hazardous manufacturing plants, we can confidently handle projects of any size or complexity.

Featured Projects

Momentive Performance Materials

Texas City, TX

RAN Fire Protection Engineering provided comprehensive fire protection design and construction administration services for Momentive Performance Materials, a plant located in Texas City, Texas. The project involved the design of a new fire pump house, intended to house a 5,000 gallons per minute (gpm) at 150 pounds per square inch (psi) fire pump, along with a new 12-inch water loop and associated hydrants throughout the facility. A sprinkler system was also designed for the pump house per NFPA-20 and NFPA-13 requirements, as well as a fire alarm system. RAN’s role encompassed site documentation, development of detailed construction documents for bidding and permitting, bid phase support, and construction administration, culminating in a final site visit and punch list.

New York State Capitol Building

Albany, NY

The NYS Capitol Building houses the New York State Governor’s Office and the New York State Legislature.

Services Provided:

  • Code Analysis                                       
  • Fire Pump Design
  • Fire Alarm System Design    
  • Preservation of Historical Building

 

The building was completed in 1899 at a cost of $25 million, a modern day equivalent to roughly half a billion dollars. RAN Fire Protection Engineering, P.C. commenced work on the NYS Capitol project to address the existing level of fire protection.

The project involved the investigation of the existing fire pump arrangements to assess measures concerning flow problems. The design required the removal of three fire pumps, which allowed for consolidation into one fire pump with emergency backup power. The project also included the upgrading of the fire department hose valves on all eight standpipes throughout the building. The design increased the functionality and general reliability of the fire protection system in its entirety.

Vermont Air National Guard

South Burlington, VT

RAN Fire Protection Engineering provided fire protection engineering support for the commissioning of the emergency voice communication and fire alarm mass notification systems serving aircraft maintenance facilities associated with the F-35 Phase 1 Building 150 project. RAN reviewed testing procedures and submittals prepared by the system contractor, provided technical comments to address specification compliance, and issued review approvals for final commissioning documentation submitted to the Engineer of Record.

RAN also supported system troubleshooting and coordinated with multiple engineering disciplines and trades to resolve integration issues and verify proper operation of the fire alarm and mass notification systems. This work helped ensure the facility’s life safety systems were operational in advance of aircraft transition activities, supporting the Vermont Air National Guard’s conversion from F-16 aircraft to the F-35A fighter program. 

 

Size: 50,000 sqft | Construction Cost: $425,000